The Grimsby Record

Public Works Committee

September 10, 2014

What was decided (3 motions)

3 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.

Resolved that Report DPW14-37 dated September 5, 2014 regarding ‘Engineering Services for 2015 Capital Watermain Replacement Project PWC15-06-440032: Vine Road, Walnut Street, Gage Street, St. Andrews Avenue, John Street, Nelles Road South, Dorchester Drive and Lorne Avenue be received and that the Director of Public Works be authorized to award the design, contract administration and on-site supervision to W. Mackay Engineering Services in the total estimated amount of $46,850.00, excluding H.S.T., including a $360.00 per diem rate for construction inspection in 2015.
Moved by Alderman S. Berry, seconded by Mayor R.N. Bentley
Carried
Resolved that the GDIA meeting minutes of July 15, 2014 be received as circulated and filed for records purposes.
Moved by Alderman S. Berry, seconded by Alderman D. Finch
Carried
Finch; Resolved that the correspondence regarding the West End Waterfront Trail - EA, Public Information Centre to be held on the 24th of September 2014 at the Town Hall from 5-7 p.m. be received for information.
Moved by Alderman N. DiFlavio, seconded by Alderman D
Carried

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.