Everything on this site is searchable — a file number, a councillor, a motion, a meeting, or an application.
Committee of Adjustment
May 7, 2019
What was decided (6 motions)
6 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.
Resolved that the minutes of the Committee of Adjustment meeting of April 2, 2019 be approved as circulated. Page 2 of 7 Committee of Adjustment May 7, 2019
Moved by D. Beck, seconded by N. Andreychuk
Carried
Resolved to amend the application for minor variance by Adam Finocchi and Jennifer Baker at #93 Fairview Road to change the exterior side yard setback of 2.7 metres to 4.73 metres as shown on the submitted survey and to include a 7.3 metre driveway width on Lakeside Drive and to allow a 1.8 metre fence to be replaced along the northerly lot line a distance of 7.6 metres from the north west corner of the subject lands.
Moved by A. Mottershead, seconded by N. Andreychuk
Carried
Resolved that Submission A-05/19 by Adam Finocchi and Jennifer Baker to allow for the construction of a 36.6 square metre one storey addition and a 60 square metre attached garage with an exterior side yard setback of 4.73 metres, a rear yard setback of 7.6 metres, a total building depth of 24.8 metres, a lot coverage of 39%, a 7.3 metre driveway width on Lakeside Drive and to allow a 1.8 metre fence to be replaced along the northerly lot line a distance of 7.6 metres from the north west corner of the subject lands in a Residential Detached (RD 3.35) Zone at 93 Fairview Road, Grimsby be approved with conditions for the following reasons: 1. The Variance is minor in nature. 2. The intent of the Official Plan and Zoning By-law is maintained. 3. The proposal is desirable for the appropriate development of the land. Subject to the following conditions: 1. The applicant remove the fence from public property as per the Public Works Department requirement; 2. The applicant obtain a driveway apron permit; and 3. The applicant confirm that 2 parking spaces can be provided within the garage or elsewhere on the property. Page 4 of 7 Committee of Adjustment May 7, 2019
Moved by N. Andreychuk, seconded by A. Mottershead
Carried
Resolved that Submission A-09/19 by Renee and Susan E. Klassen to allow for the construction of a two storey 83.614 square metre accessory structure with a height of 4.8 metres at mid-point of the peak in a Low Density Residential (RD 2.25) Zone at 24 Marlow Avenue, Grimsby be granted for the following reasons: 1. The Variance is minor in nature. 2. The intent of the Official Plan and Zoning By-law is maintained. 3. The proposal is desirable for the appropriate development of the land. Page 5 of 7 Committee of Adjustment May 7, 2019
Moved by D. Beck, seconded by A. Mottershead
Carried
Resolved that Submission A-10/19 by David Bell and John Bedell to for the construction of a 9.1 metre x 9.1 metre residential detached accessory building (garage) with a rear and side yard setback of 1.5 metres to a Legal Non-Conforming Dwelling in a Prestige Employment (PE) Zone at #8 Lincoln Avenue, Grimsby be granted for the following reasons: 1. The Variance is minor in nature. Page 6 of 7 Committee of Adjustment May 7, 2019 2. The intent of the Official Plan and Zoning By-law is maintained. 3. The proposal is desirable for the appropriate development of the land.
Moved by A. Mottershead, seconded by N. Andreychuk
Carried
Resolved that Submission B-02/19 by Henry A. Colyn and Tony M. Colyn for consent to convey be granted as per the Notice of Decision.