Everything on this site is searchable — a file number, a councillor, a motion, a meeting, or an application.
Committee of Adjustment
January 29, 2013
What was decided (6 motions)
4 carried, 2 recorded otherwise. Every motion below is printed as the minutes print it.
Resolved that the Minutes of the Committee of Adjustment meeting of November 13, 2012 be approved as circulated.
Moved by P. Settimi, seconded by R. Bennett
Carried
Resolved that Submission A-01/13 by M. Filipovic to allow for the construction of a 7910 square foot two storey dwelling unit, with a rear yard setback of 2.30 metres, and a lot coverage of 41.3% in a Residential R1 Zone at # 52 Dorchester Drive, Grimsby be
Moved by K. Hipkin, seconded by H. Nobes
Deferred
Resolved that Submission A-02/13 by Mira Filipovic, to allow for the construction of a 6918 square foot two storey dwelling unit, with a front yard setback of 1.84 metres, a side yard setback of .45 metres, a rear yard setback of 2.43 metres, and a lot coverage of 37.5% in a Residential R1 Zone at # 50 Dorchester Drive, Grimsby be
Moved by K. Hipkin, seconded by H. Nobes
Deferred
Resolved that Submission A-03/13 by Roger & Janet Rankin, to allow for the construction of a 147.4 square metre accessory building (garage) with a Page 5 of 6 Committee of Adjustment January 29, 2013 lot coverage of 8.8% in a Rural Residential RR Zone at # 314 Mountain Road, Grimsby be granted for the following reasons: 1. The Variance is minor in nature. 2. The intent of the Official Plan and Zoning By-law is maintained. 3. The proposal is desirable for the appropriate development of the land.
Moved by R. Bennett, seconded by P. Settimi
Carried
Resolved that Submission A-04/13 by John Dal Pra, to legalize the location of a 7.25 metre x 4.75 metre accessory structure with a 0.20 metre setback from the main building in a Residential R2 Zone at # 1 Park Road North, Grimsby be granted for the following reasons: 1. The Variance is minor in nature. 2. The intent of the Official Plan and Zoning By-law is maintained. 3. The proposal is desirable for the appropriate development of the land.
Moved by P. Settimi, seconded by R. Bennett
Carried
Resolved that the Secretary/Treasurer be authorized to pay travelling Expenses for 2012 to members of the Committee of Adjustment in the total amount of $1,971.84 detailed in Report CA-13-1 dated January 29, 2013.